Transocean Recruitment
Nigeria-Job Vacancies 2012
Assistant Driller
If you can live up to Transocean's core values and meet
these requirements we would like to hear from you. 
| 
1. | 
Valid Well control certificate  | 
| 
2. | 
Prior experience working as an Assistant Driller on a
  Jackup / Semi / Drillship  | 
| 
3. | 
Assist the Driller in operating drilling and mud
  circulating equipment as instructed in the well program and in accordance to
  Company policies and procedures  | 
| 
4. | 
Perform the drilling department's daily checklists, i.e.
  QHSE checks, mast/Derrick inspection, choke and kill manifold set up, etc.  | 
| 
5. | 
Maintain accurate records of tubular and tool dimensions
  (i.e. internal and external diameter, fish neck, and serial numbers)  | 
| 
6. | 
Calculate ton-miles on drilling line; maintain an accurate
  logbook and advise the Driller on the need to slip and cut  | 
| 
7. | 
Maintain an organized drilling equipment store and tubular
  and subs inventory  | 
| 
8. | 
Read and interpret various gauges and meters relating to
  the drilling operations; assist the Driller in maintaining records and logs  | 
| 
9. | 
Actively participate in pre-tour meeting with the drilling
  crew for all drilling operations  | 
| 
10. | 
Organize and supervise the drilling crews for all
  operations  | 
| 
11. | 
Assist the Driller during an emergency or well control
  situation; assist in the well killing operations  | 
| 
12. | 
Assist in supervision of Preventive Maintenance carried
  out on drilling equipment  | 
| 
13. | 
Assist in supervision of repairs on drilling and
  associated equipment  | 
| 
14. | 
Assist in running and cementing casing strings, running
  and retrieving BOPs and risers, and other operations as directed by the
  Driller or Toolpusher  | 
| 
15. | 
Monitor mud systems and supervise solids control equipment
  and mud mixing operation  | 
| 
16. | 
Assist in the planning, organization and execution of rig
  move operations  | 
| 
17. | 
Operate drilling and associated equipment as directed by
  the Driller, i.e. Top Drive System, mud pumps, BOP and Diverter controls,
  etc.  | 
 
  
 



No comments:
Post a Comment